Private School gets a sports area upgrade in High Wycombe.

The brief was to upgrade and make accessible the area alongside the Tennis and Netball Courts for Spectator viewing of competitions. The bank was a steep 1 in 4 gradient running down to the court fencing. Not the easiest of areas to construct in especially given all the tree stumps we had to negotiate without compromising on the integrity of the structure. The solution was to construct a stairway that took you from the top football pitch down to a 65m long boardwalk with 4 built in seating and rain shelters.

f1f3e0_d02d8dc701274c0e91d5488b20c84f20
f1f3e0_f17f50be1898475b87865f83ab433cf7
f1f3e0_58ad6da40ef04cf98f32356bee548b1c