Out with the Old and In with a New elevated Hardwood Deck.

We removed the existing deck due to rotten timber which was due to poor construction where internal carpentry and joinery skills were used externally creating a number of water traps that accelerated the timber deterioration.

Requirements were that we had to use the existing post mounts and height constraints that meant a single layer framework had to be used. The support posts are IPE Hardwood along with the rest of the deck and balustrade