Bramley Steps Public Open Space – Ealing, West London.

Before , During and After pictures of our project that required a design and build solution to provide safe access up the steep bank to the landscaped open space. Adhering to part M of the building regulations which requires shallow steps and a gentle gradient, meant cutting into the bank and then retaining the soil with sleepers. The ground had contaminated soil which was subsequently removed and then top soil added and then regraded back to the sleepers and put to grass seed.

f1f3e0_49735ef617414e5d816d608cd68431aa
f1f3e0_2935a73dfe844ac48f78729f899bc75c
f1f3e0_30b7e5239e404b4db1e6d0a47abf1522