Bramley Steps Public Open Space – Ealing, West London.

Before , During and After pictures of our project that required a design and build solution to provide safe access up the steep bank to the landscaped open space. Adhering to part M of the building regulations which requires shallow steps and a gentle gradient, meant cutting into the bank and then retaining the soil with sleepers. The ground had contaminated soil which was subsequently removed and then top soil added and then regraded back to the sleepers and put to grass seed.