Bramley Steps Public Open Space – Ealing, West London.

October 2, 2010

Before , During and After pictures of our project that required a design and build solution to provide safe access up the steep bank to the landscaped open space. Adhering to part M of the building regulations which requires shallow steps and a gentle gradient, meant cutting into the bank and then retaining the soil …

Eco Building

January 2, 2008

We have now started construction on the foundations to a sustainable Eco building which will be used as a workshop and storage facility covering 175 sq.m (1500sq.ft). Ground excavation, retaining walls and footings. Followed by drainage systems.

1 7 8 9